Tensioning and grouting in precast yards, incremental launching for suspension and cable-stayed bridges, complete equipment for continuous beam construction.
Moving heavy structures into position, box culvert jacking, complete equipment for trenchless construction.
Space truss lifting, steel cofferdam lowering, 3D fine positioning, synchronous load testing.
Deep excavation support, ground anchorage tensioning, pile static load tests, rubber bearing replacement.
Our management system is reliable and our products have been tested by the relevant national authorities: quality and performance fully comply with the FIP Recommendations for the Acceptance and Application of Post-Tensioning Systems and with Chinese standards GB/T 14370-2000 and JG 2028-5030-93.