Welcome to Daimqilin · Professional manufacturer of prestressing equipment Hotline: +8615978163133 | Rental · Custom build · After-sales, one stop

Construction Site Photos

Home / Projects / Site Photos
07Construction Site20 real on-site shots · bridge / tunnel / stadium / precast beam yard

Pier-top cantilever casting

Continuous rigid-frame bridge: 0# block bracket and form-traveler installation, full view of the pier-top working face.

Main-cable strand erection

Suspension-bridge PPWS main-cable strand pulling & erection; traction system working with the catwalk.

Walking-type incremental launching

Steel box-girder incremental launching; multi-point synchronous pushing with controlled positioning accuracy.

Deck-track pushing

Close-up of deck tracks and pushing equipment; clamp-rail pushing system layout on site.

Pier-top cylinder beam jacking

Pier-top pushing cylinders and beam-jacking device; large-capacity synchronous lifting.

Beam-bottom lifting reaction frame

Beam-bottom lifting reaction frame and cylinder layout; for existing-bridge retrofit and bearing replacement.

Beam-bottom heavy-capacity lifting

Full view of the beam-bottom heavy-capacity lifting rig; multi-cylinder synchronous control adjusts in real time.

Sky-bridge integral lifting

Steel sky-bridge between twin towers lifted into place; a typical use of the hydraulic synchronous lifting system.

Steel box-girder deck erection

Suspension-bridge deck-panel hoisting & erection; the erector cooperating with main-cable hangers.

Pylon arched crossbeam construction

Main-pylon arched crossbeam and steel truss work; pylon climbing-form synchronous work face.

CNC pump station layout

Continuous lifters and CNC pump station on site; tidy hydraulic hoses and strand routing.

Beam-bottom lifting & bearing replacement

Beam-bottom lifting reaction frame, jacks and displacement monitoring arranged as a set.

In-tunnel jacking

In-tunnel ultra-high-pressure cylinder continuous pushing; segments and rails coordinated.

Stadium roof-truss lifting

Long-span stadium roof-truss integral lifting; multi-point synchronous lifting towers arranged.

Tensioning pump-station operation

Intelligent tensioning pump station on site; control panel and safety devices complete.

Box-girder grouting

Prestressed intelligent grouting equipment on site; automatic metering, continuous grouting.

Steel-girder lifter cluster

Continuous lifters clustered on a steel girder; multi-jack synchronous control.

Tensioning rig assembly

Tensioning rig assembled on site; hollow-center jacks and hoses connected.

In-tunnel traction

In-tunnel continuous traction & pushing rig; long-distance traction into position.

Pushing jack group coordination

Multi-point pushing jacks grouped on a steel-girder deck; centralized hose routing, synchronous pushing work face.

Have a similar job to do?

Tell us your working conditions — free equipment selection and construction plan advice.

Submit an inquiry