Continuous rigid-frame bridge: 0# block bracket and form-traveler installation, full view of the pier-top working face.
Suspension-bridge PPWS main-cable strand pulling & erection; traction system working with the catwalk.
Steel box-girder incremental launching; multi-point synchronous pushing with controlled positioning accuracy.
Close-up of deck tracks and pushing equipment; clamp-rail pushing system layout on site.
Pier-top pushing cylinders and beam-jacking device; large-capacity synchronous lifting.
Beam-bottom lifting reaction frame and cylinder layout; for existing-bridge retrofit and bearing replacement.
Full view of the beam-bottom heavy-capacity lifting rig; multi-cylinder synchronous control adjusts in real time.
Steel sky-bridge between twin towers lifted into place; a typical use of the hydraulic synchronous lifting system.
Suspension-bridge deck-panel hoisting & erection; the erector cooperating with main-cable hangers.
Main-pylon arched crossbeam and steel truss work; pylon climbing-form synchronous work face.
Continuous lifters and CNC pump station on site; tidy hydraulic hoses and strand routing.
Beam-bottom lifting reaction frame, jacks and displacement monitoring arranged as a set.
In-tunnel ultra-high-pressure cylinder continuous pushing; segments and rails coordinated.
Long-span stadium roof-truss integral lifting; multi-point synchronous lifting towers arranged.
Intelligent tensioning pump station on site; control panel and safety devices complete.
Prestressed intelligent grouting equipment on site; automatic metering, continuous grouting.
Continuous lifters clustered on a steel girder; multi-jack synchronous control.
Tensioning rig assembled on site; hollow-center jacks and hoses connected.
In-tunnel continuous traction & pushing rig; long-distance traction into position.
Multi-point pushing jacks grouped on a steel-girder deck; centralized hose routing, synchronous pushing work face.
Tell us your working conditions — free equipment selection and construction plan advice.
Submit an inquiry